DEEP SEWER CONNECTION
WATER CORPORATION

September, 2020

Pipeline Technics were awarded the contract to install a boundary trap on an existing 225 vitrified clay sewer line in Cannington, Perth Western Australia. The purpose of this project was to relieve odour and pipe blockage issues.

The extent of the works required a full road closure.  Coupled with the fact that the works were located in a residential area, it was essential that this project was completed within a very narrow timeframe, with little disruption to residents.

The complexity of this project was exacerbated by the depth of the sewer and the presence of a high water table in the area.

With our vast experience of working in confined spaces and dealing with ground water, the client had no hesitation in awarding Pipeline Technics the project.

This project was completed safely, with little disruption to residents and within the requested one week time frame.

Our long history with this client meant that they had confidence in our ability to complete the works on time, and in challenging conditions.